> ## Content Index
> Fetch the complete content index at: https://ettayeb.fr/llms.txt
> Use this file to discover other available public pages before exploring further.

# Microsoft ends license-included Azure VMware Solution, and Broadcom’s VCF becomes the only door in
- URL: https://ettayeb.fr/en/cloud/azure-vmware-solution-byol-vcf-en/
- Published: 2026-08-21T00:00:00.000Z
- Updated: 2026-11-23T15:26:23.000Z
- Description: On August 20, 2026, Microsoft announced the retirement of the license-included Azure VMware Solution: sales stop after October 31, 2026, and a mandatory move to a VCF BYOL model before August 30, 2027.
- Author: Walid ETTAYEB
- Tags: Cloud, azure, vmware, broadcom, vcf, avs, #en, #Import 2026-11-23 14:52

**August 20, 2026.** **Microsoft** announces the end of the **license-included** version of **Azure VMware Solution** (**AVS**). **October 31, 2026.** Sales of that offer stop. **August 30, 2027.** Customers must have moved to a **BYOL** model built on **VMware Cloud Foundation** (**VCF**), or face service disruption.

For a cloud leader, the news fits in one sentence: the last doorway into **VMware** without going through **Broadcom**’s big bundle is closing, and both the bill and the architecture need to be revisited before **2027**.

## What AVS was, and what Broadcom did to it

**Azure VMware Solution** is **Microsoft**’s long-standing offer for anyone who wants managed **VMware** inside **Azure**: **vCenter**, **vSAN**, **vSphere**, and **NSX**, licenses included, operated by Microsoft. It was the alternative for organizations that wanted to stay on **VMware** without jumping to **VCF** — the single bundle **Broadcom** has built its entire strategy around since the acquisition.

The nuance that matters: **AVS** does **not** include the **SDDC Manager**, the centralized management tool **Broadcom** uses to package its wares into a hybrid cloud in **VCF**. **AVS** was therefore, structurally, a path **outside VCF** — and that is exactly what **Broadcom** no longer wants to leave open.

Since the acquisition, **Broadcom** has made **VCF** the only commercial axis: no more standalone entry-level virtualization product, and — a decision announced **late 2025** — hyperscale partners are no longer allowed to sell **VMware** licenses. In practice, **Microsoft**, **Google Cloud**, and the others must now require customers to bring **their own VCF licenses**. The shift of **AVS** to **BYOL** is the direct application of that rule at **Microsoft**.

## The timeline, in plain terms

**Microsoft**’s announcement breaks into two deadlines that must not be confused. The first, **October 31, 2026**, ends **sales** of the license-included version. The second, **August 30, 2027**, ends operations: existing environments **will no longer work** if they have not migrated to **AVS VCF BYOL**.

**Microsoft**’s guidance is explicit and unusually blunt: “allow plenty of time to purchase VCF licenses from Broadcom and complete the transition,” and “start assessing current AVS environments immediately.” The phrase “avoid service disruption on August 31, 2027” says what the announcement softens: this is a firm deadline, not a recommendation.

For affected customers, the work does not start on switchover day. It starts with an inventory: which environments still run on **AVS**, what workload they host, and how long a migration really takes. A managed **VMware** estate does not move in a quarter, especially when the destination imposes a license-model change on top of an infrastructure change.

## The real cost is VCF, not Azure

The financial pivot is not the cloud: it is the license. **Broadcom** demands **VCF** as the only ticket in, and **VCF** is billed **per core**, with minimums that change the equation for mid-sized estates. A cluster of a few hosts running on a simple **vSphere** license now has to fund a full suite, billed on a **16-core-per-socket** minimum, on subscription.

The consequence is a calculation every **AVS** customer must make calmly before **2027**: **stay** on **VMware** via **VCF BYOL**, or **leave** **VMware** for an alternative. This is not the first time this estate has been pushed to choose — **Broadcom** has already forced two waves of discontinuation among smaller cloud providers, and **Allstate** walked away from **Broadcom** while alleging a retaliatory license audit on the way out. The **AVS** shift extends the same pressure to hyperscaler customers.

The question is not theoretical. For a typical enterprise workload on **AVS**, staying means negotiating a **VCF** license, mapping it onto the **Azure** estate, then running the **BYOL** transition. Leaving means re-architecting: **Azure VMware Solution** has no one-to-one native equivalent, and a move to native **Azure VMs**, **AKS**, or **KVM** virtualization means rethinking the operations layer, not just moving virtual machines.

## What to do before the deadline

The operational response runs in three steps, in order, and the first starts now.

**Inventory.** List the **AVS** environments, their workloads, their network dependencies, and their maintenance windows. Without this inventory, no option can be costed seriously.

**Price both branches.** On one side, the cost of **VCF BYOL** — a **Broadcom** license, negotiated at volume — plus the cost of the technical transition. On the other, the cost of an exit migration, to **native Azure VMs** or an alternative platform. The costing must include downtime, not just the license.

**Decide, then plan backward.** **August 30, 2027** is the arrival point; the decision itself must come well before **October 31, 2026**, since license-included sales stop there and any new need will already have to go through **VCF**. A late decision shrinks the options to one: migrating in a hurry.

## Verdict

**If you still run Azure VMware Solution**, the strategic decision is made now, not in **2027**. **October 31, 2026** freezes the license model; **August 30, 2027** freezes the infrastructure. Stay on **VMware** only if you are ready to fund **VCF** at the scale of your estate — otherwise, start an exit to **native VMs** or a **KVM** alternative while there is still time to do it cleanly.

**If you are evaluating VMware for a new project**, the question already has its answer: do not enter an ecosystem whose only door is a per-core bundle. The signal **Microsoft** sends by closing the license-included option is unambiguous — **Broadcom** has definitively made **VCF** the only path into **VMware**, and that path has a price.

**The rule to remember**: the end of license-included **AVS** is not another price hike, it is the closure of an architectural alternative. **Broadcom**’s **VCF** becomes the only door in, and every customer must now choose between paying for that door or building the exit.

## References

- [Microsoft ends one of the last ways to buy VMware without big bundles — The Register](https://www.theregister.com/virtualization/2026/08/20/microsoft-ends-one-of-the-last-ways-to-buy-vmware-without-big-bundles/5290044?ref=ettayeb.fr), August 20, 2026
- [Azure VMware Solution — Microsoft update (official announcement)](https://azure.microsoft.com/en-au/updates?id=569535&ref=ettayeb.fr), August 20, 2026
- [Microsoft is discontinuing VMware licenses within Azure — Techzine](https://techzine.eu/news/infrastructure/143729/microsoft-is-discontinuing-vmware-licenses-within-azure/?ref=ettayeb.fr)