Laos loses nearly four days of BGP routing with no attributed cause
Between September 2 and September 6, 2026, Laos saw its BGP control-plane visibility collapse for 3.7 days, with no public cause offered. The outage measures what a lightly multi-homed country costs, and reminds operators to verify route redundancy before the failure, not after.